Export Product Catalog (2026)
Complete export catalog: 20ft expandable house dimensions, full configuration specifications — frame, wall panels, flooring, doors and windows.
PDF · 4 pages · 0.8 MB · Updated 2026-09
Free technical resources for importers and developers: product catalogs, company introduction, floor plans and electrical drawings. All files are provided by Hebei HuoSheng Integrated Housing Co., Ltd. and may be updated as specifications evolve — contact us if you need the latest revision.
Complete export catalog: 20ft expandable house dimensions, full configuration specifications — frame, wall panels, flooring, doors and windows.
PDF · 4 pages · 0.8 MB · Updated 2026-09
26-page illustrated introduction: factory tour, production lines, workshop details, quality control and packing standards.
PDF · 26 pages · 10.6 MB · Updated 2026-09
Full 33-slide presentation: company profile, factory capabilities and the complete product range — double-wing expandable, flat pack and folding houses.
PDF · 33 slides · 7.4 MB · Updated 2026-09
Two-page technical specification for the 20ft double-wing expandable container house: dimensions, materials and configuration.
PDF · 2 pages · 0.1 MB · Updated 2026-09
Dimensioned floor plan with electrical and plumbing layout: sockets, lighting, switches and media points for the 20ft expandable layout.
PDF · 1 page · 0.5 MB · Updated 2026-09
Hot and cold water supply lines with drainage routing for the standard bathroom module of the 20ft expandable house.
PDF · 1 page · 0.8 MB · Updated 2026-09
Electrical layout for the flat roof double-wing type: circuit routing, socket positions, lighting and control box placement.
PDF · 3 pages · 0.4 MB · Updated 2026-09
Need a drawing or specification that is not listed here? Ask our export team — technical documents are confirmed and shared per project.