Delivered projects

Expandable container homes from our factory, photographed on site in New Zealand and Australia.

In short

Two private homes built from our 40ft double-wing expandable container house and installed in March 2026, photographed on site at installation: a gable-roof home with a covered veranda in Auckland, New Zealand, and a flat-roof home with wood-grain cladding in Melbourne, Australia. Both are owner-occupied residences. Over the past two years, hundreds of double-wing expandable homes from our factory have been delivered to Australian customers.

Auckland, New Zealand: gable-roof home with veranda

Location
Auckland, New Zealand
Size
40ft
Installed
March 2026
Use
Private home, owner-occupied
Features
Covered front veranda with railing, glazed double doors, light cladding with white trim
Gable-roof double-wing expandable home with covered veranda in Auckland, New Zealand
Front veranda with glazed double doors.
Side view of expandable container home in Auckland showing the expanded wing and steel stands
Side view: the wing seam and container corners are visible.
Owners at the entrance of their expandable container home in Auckland
Final fit-out on site.
Expandable container home with veranda being completed in Auckland
Veranda and stands being finished.

Melbourne, Australia: flat-roof home with wood-grain cladding

Location
Melbourne, Australia
Size
40ft
Installed
March 2026
Use
Private home, owner-occupied
Features
Wood-grain exterior cladding, black-frame windows, glazed end wall with awning windows
Flat-roof double-wing expandable container home with wood-grain cladding in Melbourne, Australia
Long side with sliding door and black-frame windows.
Glazed end of an expandable container home being installed in Melbourne
Glazed end wall during installation on timber piles.

What these projects show

  • The same double-wing module suits two different markets: a gable roof where pitch matters, and a flat roof with 2.4 m internal height developed for Australia.
  • The home arrives folded and is opened and set on stands or piles on site; the foundation is chosen by the owner's local team for the ground and local rules.
  • Cladding, window frames and verandas are chosen per order.

Local approval is the owner's responsibility. See New Zealand consent routes and Australian council approval. For how ordering works, see how we work.

Want a home like these?

Send the country, size and quantity. We reply with an itemised quotation and drawings.

Send your project brief

Frequently asked questions

Have your container homes been delivered to New Zealand and Australia?

Yes. This page shows a private home in Auckland, New Zealand and one in Melbourne, Australia. Over the past two years hundreds of our double-wing expandable homes have been delivered to Australian customers.

Which model are these homes?

Both are the 40ft double-wing expandable container house, installed in March 2026: the Auckland home has the gable roof and the Melbourne home has the flat roof.

Can I talk to you about a home like these?

Yes. Send your country, size and quantity and we reply with an itemised quotation and layout drawing.