Double-Wing Expandable Container House
Wings fold down for shipping, open up to a full-width home with veranda options.
In short
The HuoSheng double-wing expandable container house ships folded as one container-sized module and opens on site into a full-width home. It comes in 20ft, 30ft and 40ft sizes, with a gable roof (2.3 m internal height) or a flat roof (2.4 m). A 20ft unit weighs about 3.8 t on a welded galvanized steel frame with 8 container corners for lifting.
- Track record
- Hundreds delivered to Australian customers in the past two years
- Sizes
- 20ft / 30ft / 40ft
- Internal height
- 2.3 m gable / 2.4 m flat roof
- Weight (20ft)
- About 3.8 t
- Manufacturer
- Hebei HuoSheng Integrated Housing Co., Ltd., Hebei, China
- Starting price (EXW)
- 20ft from USD 6,500 · 30ft from USD 7,500 · 40ft from USD 9,000, bathroom and kitchen fitted (price guide)
- Price basis
- Itemised quotation, EXW, FOB (Chinese port) or CIF (your port)
- Payment
- 30% T/T deposit, 70% T/T balance before shipping
- Sample
- Single sample unit available
- Inspection
- Every unit checked before packing; buyer or inspector welcome
- Lead time
- Confirmed with each quotation

Overview
The double-wing expandable container house is our flagship export model. The two side wings fold down onto the main module so a complete home ships as a compact container, then opens on site to a full-width layout with optional veranda. In the past two years hundreds of these homes have been delivered to Australian customers, with gable and flat roof types covering different market requirements.
Two roof types
Gable double-wing house
Sloped gable roof, internal height 2.3 m. The popular choice for European and American markets where pitch and snow shedding matter.
Flat roof double-wing house
Internal height 2.4 m for customers who need extra clearance. Developed for Australia and clients with special height requirements.
Key points
- Two roof types: gable for Europe/America, flat roof with higher internal clearance for Australia
- 20ft / 30ft / 40ft sizes with reference floor plans provided
- Galvanized steel frame with 8 shipping container corners for safe hoisting
- Australia-certified plumbing and AU-standard window/door options available
- Standard 20ft unit weighs about 3.8 t thanks to premium steel, versus roughly 2.6 t common in the industry
Photos from real projects





Reference floor plan
Reference floor plans for 20ft, 30ft and 40ft layouts are available; layouts are customized to each market and confirmed before production.

See this model installed as private homes in Auckland and Melbourne: delivered projects.
Frequently asked questions
What sizes does the double-wing expandable house come in?
20ft, 30ft and 40ft. Reference floor plans are provided for each size and the layout is confirmed before production.
What is the difference between the gable and flat roof versions?
The gable roof gives 2.3 m internal height and suits markets where roof pitch matters. The flat roof gives 2.4 m internal height and was developed for Australian clearance requirements.
Has this model been exported to Australia?
Yes. In the past two years hundreds of double-wing expandable homes have been delivered to Australian customers, with AU-standard window, door and plumbing options available.
How much does a 20ft expandable unit weigh?
About 3.8 t, because of the heavier steel used in the frame.
How is the price quoted?
Every quotation is itemised and priced EXW (factory), FOB (Chinese port) or CIF (your port). Send the country, size and quantity and we reply with a quotation, layout drawing and loading plan.
What are the payment terms?
30% T/T deposit to start production and 70% T/T balance before shipping.
Can I order one sample unit first?
Yes. Many buyers start with one unit to check build quality and installation before ordering in volume.
Can I see the factory or inspect my units?
Yes. We give live video tours of the production line on WhatsApp (+86 157 9281 7010), visitors are welcome at the factory in Hebei, and you or your inspector can attend the pre-shipment inspection.
Will it be approved in New Zealand or Australia?
That depends on your site, your local rules and your council. We supply drawings and a specification sheet for your designer or engineer. See our New Zealand buyers page and Australian council approval guide before you order.