2026-11-17 · 6 min read

How Much Does an Expandable Container Home Cost? 2026 Factory Prices

Our double-wing expandable homes start from USD 6,500 for a 20ft unit at the factory gate, with the bathroom and kitchen already fitted. Here is what that number covers, what it leaves out, and how to turn it into a realistic landed cost for Australia, New Zealand or the UK.

In short

HuoSheng double-wing expandable container homes start from USD 6,500 (20ft), USD 7,500 (30ft) and USD 9,000 (40ft), EXW at our Hebei factory, as of November 2026. Every starting price includes a fitted bathroom, kitchen, bedroom and living area. Freight, import taxes, foundations, crane and local connections are extra and depend on where you are.

Starting prices by size

SizeStarting price (EXW factory)Included at this price
20ft double-wingFrom USD 6,500Bathroom, kitchen, bedroom and living area fitted
30ft double-wingFrom USD 7,500Bathroom, kitchen, bedroom and living area fitted
40ft double-wingFrom USD 9,000Bathroom, kitchen, bedroom and living area fitted; reference layout 2 bedrooms, 1 bathroom

Prices are per unit in US dollars, Ex Works at our factory in Jing County, Hebei, China, and valid as of November 2026. The final figure is confirmed on an itemised quotation for your configuration. See the double-wing product page for the full specification, and our guide to choosing between 20ft, 30ft and 40ft.

What moves the price up or down

The starting price is a fitted, livable unit. These are the choices that change the quotation:

  • Roof type: gable (2.3 m internal height) or flat roof (2.4 m).
  • Options such as a veranda, AU-standard windows and doors, upgraded roof waterproofing or flooring.
  • Loose furniture and appliances, if you want them supplied.
  • Order quantity and how the units are loaded.
  • Price basis: EXW, FOB at a Chinese port, or CIF to your port.

Our cost framework explains each driver in more detail.

What the EXW price does not include

Cost lineWho usually arranges itNotes
Inland transport and export clearance in ChinaBuyer, or we quote FOBIncluded if you ask for an FOB quote
Sea freight and insuranceBuyer, or we quote CIFFreight markets change; ask for a current CIF figure
Import GST or VAT and any dutyBuyer or customs brokerAustralia: GST of 10% on the value of the taxable importation. New Zealand: GST of 15% on customs value plus duty, freight and insurance. UK: import VAT at the applicable rate
Port, broker and biosecurity chargesBuyer or customs brokerFor example NZ charges a high-value sea import levy per entry
Truck and crane to siteBuyer, local contractorDepends on access to your site
Foundation or supportsBuyer, local contractorSee our foundation guide
Water, power and drainage connectionsLicensed local tradesRequired by local rules
Council consent or building approvalBuyerDepends on use and location

To compare quotes on the same basis, use our landed-cost framework.

How to get an exact quote

  • Tell us the size, roof type and how many units.
  • Tell us your destination port, and whether you want EXW, FOB or CIF.
  • List any options: veranda, windows and doors standard, furniture, appliances.
  • We reply with an itemised quotation and the reference floor plan. Payment terms are 30% T/T deposit and 70% before shipping. See how ordering works.

Ask for a quote on our contact page or on WhatsApp +86 157 9281 7010.

Sources

Prices on this page are starting prices for HuoSheng double-wing units as of November 2026 and are confirmed on each quotation. Tax and import information is general; check your own position with a customs broker or the relevant authority.

Frequently asked questions

How much does an expandable container home cost?

HuoSheng double-wing expandable container homes start from USD 6,500 for a 20ft unit, USD 7,500 for a 30ft unit and USD 9,000 for a 40ft unit, EXW at our factory in Hebei, China (prices as of November 2026). The starting price includes a fitted bathroom, kitchen, bedroom and living area. Roof type, options and order quantity change the final quotation.

Does the price include the bathroom and kitchen?

Yes. The starting prices above are for a unit with a bathroom, kitchen, bedroom and living area fitted in the factory. Loose furniture, appliances and optional upgrades such as a veranda or AU-standard windows and doors are listed separately on the itemised quotation.

What does EXW mean on a container home quote?

EXW (Ex Works) means the price is for the unit ready for collection at our factory. Inland transport to the Chinese port, export clearance, sea freight, insurance, import duty and taxes, port charges and delivery to your site are not included. We can also quote FOB at a Chinese port or CIF to your port so you can compare like with like.

What other costs should I budget for?

Beyond the unit price, budget for freight and insurance, import GST or VAT and any duty, customs broker and port charges, truck and crane on delivery, a foundation or support system, connection of water, power and drainage by licensed local trades, and any council consent or building approval fees. These depend on your site and location, so get local quotes for them.

Is there a cheaper price for multiple units?

Order quantity is one of the factors in the quotation, along with roof type and options. Send us the size, quantity and destination port and we will send an itemised quote.

Explore these models

Not sure which format fits your project?

Send your target units, destination port and intended use — we reply with layout options, freight format and an indicative quote.

Start an inquiry