Flat Pack Container House

Panelized units that stack efficiently in a shipping container for low freight cost.

In short

The HuoSheng flat pack container house ships as a nested panelized kit, so several units travel in one shipping container and freight cost per unit stays low. It is used for site offices, worker accommodation and ablution blocks, with a welded galvanized frame, 18 mm cement board floor and an epoxy plus two-coat polyurethane paint system.

Frame
Welded galvanized square tube
Floor
18 mm cement board + PVC/SPC
Sizes and layouts
Confirmed per order
Manufacturer
Hebei HuoSheng Integrated Housing Co., Ltd., Hebei, China
Price basis
Itemised quotation, EXW, FOB (Chinese port) or CIF (your port)
Payment
30% T/T deposit, 70% T/T balance before shipping
Sample
Single sample unit available
Inspection
Every unit checked before packing; buyer or inspector welcome
Lead time
Confirmed with each quotation
Long grey HuoSheng container house with veranda resting on foundation blocks

Overview

Flat pack container houses ship as nested, panelized kits: frame, wall panels, floor and roof pack into the smallest possible volume, and several units travel inside a standard shipping container. They are a fast way to set up site offices, accommodation and ablution blocks, using the same galvanized frame, cement-board flooring and purification wall panel standards we apply across our factory.

Key points

  • Nested flat-pack stacking keeps sea freight cost per unit low
  • Same factory standards: galvanized frame, 18 mm cement board floor, purification wall panels
  • Configurable layouts for site offices, camps and storage with ablutions
  • Epoxy primer and two-coat polyurethane topcoat for long anti-corrosion life

Photos from real projects

Folded HuoSheng container house modules stacked inside the factory before dispatch
Compact grey HuoSheng container house installed on piles beside a garden wall

Model range, dimensions and layout drawings for this line are confirmed per order. Ask us for the current flat pack catalogue.

Frequently asked questions

How does a flat pack container house ship?

Frame, wall panels, floor and roof pack flat into the smallest volume, and several units are loaded into one standard shipping container.

Can a flat pack unit be used as an ablution block?

Yes. Layouts are configured for site offices, camps, and storage with ablutions, and confirmed per order.

How is the price quoted?

Every quotation is itemised and priced EXW (factory), FOB (Chinese port) or CIF (your port). Send the country, size and quantity and we reply with a quotation, layout drawing and loading plan.

What are the payment terms?

30% T/T deposit to start production and 70% T/T balance before shipping.

Can I order one sample unit first?

Yes. Many buyers start with one unit to check build quality and installation before ordering in volume.

Can I see the factory or inspect my units?

Yes. We give live video tours of the production line on WhatsApp (+86 157 9281 7010), visitors are welcome at the factory in Hebei, and you or your inspector can attend the pre-shipment inspection.

Will it be approved in New Zealand or Australia?

That depends on your site, your local rules and your council. We supply drawings and a specification sheet for your designer or engineer. See our New Zealand buyers page and Australian council approval guide before you order.