Container homes for New Zealand: consent routes and the documents we supply

What New Zealand rules ask of an imported container home, what we supply from the factory, and what your local team signs off.

The short version

New Zealand gives a container home two possible routes: the granny flats building consent exemption (Schedule 1A of the Building Act, in force since 15 January 2026) or a standard building consent. Which one applies depends on the design and the site, and it is decided by your Licensed Building Practitioner (LBP) and council, not by the factory. Our job is to give that team complete, accurate drawings and product information, quickly, and to adjust the specification when they ask.

This page sets out both routes as published by MBIE, what we supply, what your local team does, and the checks to run before you order. It is a plain-English summary, not legal advice.

Route 1: the granny flats exemption (up to 70m²)

A new standalone dwelling can be built without a building consent if every condition in Schedule 1A is met and the work complies with the Building Code. The main design conditions in MBIE's checklist are:

ConditionWhat MBIE requiresWhat it means for a container home
Size and storeysNew, standalone, single storey, 70m² or less (including any internal garage)Our 20ft, 30ft and 40ft expandable sizes are all under 70m² opened. Use the floor area on the drawing for the exact model
Location on siteAt least 2m from other residential buildings and legal boundariesCheck against the opened footprint, not the shipping size
Floor and heightFloor no more than 1m above the supporting ground; building no more than 4m above floor levelDepends on your foundations and site slope
Structural systemLight steel framing (NASH Standard Part 2:2019), light timber framing (NZS 3604), or a load-bearing composite product with a current CodeMark certificateCheck this first. Our expandable units use a welded galvanized square-tube frame with container corners. Ask your LBP or engineer whether the design can be shown to meet one of these systems before relying on the exemption
Cladding weightRoof cladding 20kg/m² or less; wall cladding 220kg/m² or lessOur sandwich-panel walls and steel roof are lightweight; we supply panel specifications on request
Wet areasShowers that need no waterproof membrane (e.g. prefabricated acrylic units); no level-entry or wet-floor showersWe can fit a one-piece shower tray or acrylic unit to suit
Licensed people and paperworkWork carried out or supervised by LBPs; a PIM issued before work starts; plans, Records of Work and electrical/gas certificates lodged within 20 working days of completionLocal work, done in New Zealand. For a unit made off-site, the PIM covers the final location

If any condition is not met, the exemption does not apply and the project needs a building consent. Source: MBIE Granny Flats Exemption Guidance, version 2 (8 October 2026).

Route 2: a standard building consent

Where the exemption does not fit, the project goes through a normal building consent with your council. For a steel-framed modular unit this usually means a local engineer prepares or reviews the structural design for the site (wind zone, earthquake, foundations and tie-downs), and the council inspects and issues a Code Compliance Certificate at the end. It takes longer, but it is the route that suits most imported modular buildings, and it gives the owner a CCC for insurance, finance and resale.

We work with the buyer's engineer: we supply frame member sizes, panel and roof specifications and connection details, and change the specification where the engineer asks, before production starts.

What we supply for every New Zealand order

  • Floor plan for the exact model, with opened dimensions and floor area
  • Electrical layout plan and water supply and drainage diagram (examples for the 20ft model are on our downloads page)
  • Specification sheet: frame, floor, wall and roof panels, windows, doors and finishes
  • Installation instructions and the packing and loading plan
  • Material and component information your engineer or LBP asks for, from our own records or our component suppliers
  • Photos and video of your unit before it leaves the factory

Tell us at quotation stage that the unit is for New Zealand, and whether you are using the exemption or a building consent, so the drawings are prepared for that route.

What your New Zealand team does

  • Confirms which route applies on your site and applies for the PIM (and building consent, if needed)
  • Designs the foundations and tie-downs for the site
  • A registered electrician checks and connects the electrical installation and issues the electrical certificates. NZ electrical rules apply on site, so plan for this from the start
  • A licensed plumber and drainlayer connect water and drainage and provide Records of Work
  • The owner lodges the completion documents and pays any development contributions

Five checks before you order

  1. Ask your LBP or engineer which route fits: the exemption (check the structural-system condition) or a building consent.
  2. Confirm the floor area and the 2m setbacks using the opened footprint.
  3. Get the council's PIM information for the site: hazards, services and development contributions.
  4. Line up the local electrician, plumber and drainlayer before the unit ships.
  5. Send us the route and any engineer comments, so we build to the agreed specification.

Planning a New Zealand project?

Tell us the site, the route your LBP recommends and the sizes you need. We reply with drawings and a quotation.

Send your project brief

Frequently asked questions

Do your container homes qualify for the NZ granny flats exemption?

It depends on the design and the site. The size limit is not the issue: all our expandable sizes are under 70m². The condition to check first is the structural system, which must be light steel framing to NASH Part 2, light timber framing to NZS 3604, or a CodeMark-certified composite product. Ask your LBP or engineer before relying on the exemption; if it does not fit, the unit can go through a standard building consent.

Can you provide NZ compliance documents?

We provide the drawings and product information that New Zealand designers, engineers and councils work from: floor plan, electrical plan, water and drainage diagram, specification sheet and installation instructions. Compliance with the NZ Building Code is confirmed in New Zealand by your licensed building professionals and council.

Who does the electrical sign-off in New Zealand?

A registered New Zealand electrician inspects and connects the installation on site and issues the required electrical certificates. Plan for this before the unit arrives.

Can you change the specification for an engineer?

Yes. Send us your engineer's comments before production starts and we will confirm what we can change and the effect on price and lead time.