2026-09-25 · 8 min read

Comparing Expandable Home Quotes: A Landed-Cost Framework for Importers

Two quotes for the same expandable container home can differ sharply and still both be honest. This is the landed-cost framework we recommend to importers: the nine cost lines to separate, the five only you control, and the RFQ structure that makes every supplier quote the same scope.

The most common mistake we see from first-time importers is comparing expandable container home quotes by the headline number. Two suppliers quote a 20ft double-wing unit, one comes in lower, and the decision looks simple. Then the containers land: the cheaper quote excluded sea freight, assumed a level pad, and treated the crane as the buyer's problem — and the order that looked cheaper costs more by the time the home is standing.

This is not usually dishonesty. Chinese factories quote what they are asked to quote, and an unclear request produces an unclear quote. If one supplier assumes CIF and another quotes FOB, if one includes the veranda and another does not, the numbers are describing different transactions. So rather than publish prices — which depend on destination port, order volume, configuration and freight markets — this article gives you the framework we use with Australian and New Zealand importers to make quotes genuinely comparable.

First: two quotes are only comparable if the product is the same

Before comparing money at all, confirm the two quotes describe the same building. Price differences usually live in the product, not the freight. Our own teardown guide sets out the layers to check — frame steel and unit weight, floor substrate, wall panel types, roof waterproofing, wet areas — and those layers are exactly where a cheaper quote saves money. A 20ft unit weighing around 3.8 tonnes and a 2.6-tonne unit are not the same product, whatever the render looks like.

So step one is a specification alignment pass: same format and length, same roof type, same panel build-up, same included fittings, same paperwork. Only once the two quotes describe the same home does the cost comparison mean anything.

The nine cost lines that make up your landed cost

Landed cost is everything you spend until the home is open and connected on your site. It is almost never a single number in a quotation, and the gaps between quotes are usually just lines one supplier listed and another left out. Below is the structure we recommend requesting from every supplier, in this order.

Cost lineWhat it coversWho usually controls it
1. Unit price (EXW / FOB)The home as built and packed at the factory, including the folded transport format and packing methodBuyer — set by specification and order volume
2. Sea freightOcean carriage in the folded load; the home ships as one compact load handled by its eight container cornersFreight market and destination port; planned with the packing plan confirmed per order
3. Origin and destination port chargesTerminal handling, documentation, customs clearance and local port fees at both endsDestination country and forwarder; the buyer controls the forwarder choice
4. Duties, taxes and biosecurity inspectionImport duty and GST/VAT on arrival plus any inspection chargesGovernment rules for the destination country
5. Inland transportRoad movement from the port to your site, including permits for oversized movement if requiredBuyer — decided by site distance and route access
6. Lifting and placementWhether a crane or container handler is needed, and where it can standConfirmed per order in the packing plan; site access is the buyer's to check
7. Foundations and groundworksPiles, slab or pads, plus levelling. A folded home only opens square onto a square foundationBuyer — your local contractor
8. Service connectionsBringing water, power and drainage to each unit's connection points; internal plumbing and circuits are already factory-built and testedBuyer — your trades, to the points marked on the factory drawings
9. Installation labour and any finishingOpening the home into its full-width floor plate and connecting services; roof-fold positions arrive factory-sealedBuyer — usually days, not weeks, of trades on site

The five cost lines only you control

Five of those nine lines are largely yours, which is why the same unit can cost materially different amounts at two sites in the same city. Inland transport depends on how far the site is from the port and whether the access route takes a standard truck. Lifting depends on whether a crane can reach the final position. Foundations depend on your ground and local engineering. Service connections depend on how far services must run. Installation depends on how much site labour you use versus the factory-built standard.

The practical consequence is worth stating plainly: optimising the unit price while ignoring these five is false economy. Grouping units along one service spine on a multi-unit site, or choosing a site a truck can reach, can save more than any negotiation on the unit itself.

How to write an RFQ that produces comparable quotes

Send every supplier the same, structured request. This is the checklist we ask importers to work from, and it is the same one we answer ourselves.

  • Target quantity and intended use — park accommodation, staff housing, site office, development — plus your destination port and site location.
  • Exact format, length and roof type, taken from the reference floor plans so both sides are describing the same footprint.
  • The material specification you want priced, layer by layer: frame and corners, floor substrate, wall panels both faces, roof waterproofing, insulation if needed.
  • Which fittings are inside the price — bathroom, kitchen zone, flooring, window and door standard, veranda — and which are excluded.
  • The incoterm you want quoted, and whether sea freight and port charges are included or the buyer's own arrangement.
  • Whether lifting equipment, foundations and site connections are in or out of scope, so you can price them separately with local contractors.
  • Delivery schedule and production lead time against your target opening date.
  • The QC documentation provided per unit — dimension checks, pressure tests, power-on inspection — and the packing plan for your sequence.

Where cheap quotes hide their savings

Once quotes are aligned, the remaining differences are real product and service differences, and they cluster in predictable places. Watch for these four.

First, material substitution — thinner steel in the frame or floor, or a timber-based substrate where the specification calls for cement board. This is the single largest source of price gaps and the hardest to spot from a photograph.

Second, scope drift — a quote that quietly assumes the buyer handles lifting, or excludes the veranda shown in the render. Third, paperwork and QC — a lower price that comes without per-unit test records, which becomes a problem later if anything needs to be traced.

Fourth, waterproofing detail — whether roof-fold positions are factory-sealed or left for site labour, and whether upgrades such as a membrane or FRP roof are priced or assumed. Each of these is a legitimate choice, but it has to be a choice you made consciously rather than a line that went missing.

None of this requires publishing a price list — it requires a request structured so that every supplier answers the same questions about the same building. Start from the reference floor plans and the 20ft specification sheet in our Download centre to fix the product scope first, then send us your quantity, destination port and intended use. We reply with layout options, the freight format, our QC and packing approvals for your sequence, and an indicative quotation stated against the exact scope you specified — so you can compare it line by line with anyone else you are talking to.

Frequently asked questions

Why don't you publish prices for your expandable homes?

Because a meaningful price depends on the specification, the quantity, the destination port and current freight rates — a single headline number would be misleading for almost every reader. Send us your configuration and destination and we quote the exact scope, so the number you compare is a real one.

Should I ask for FOB or CIF?

Either works, but be consistent across suppliers or the quotes are not comparable. Many importers ask for FOB and arrange freight themselves so they can see the ocean cost separately; others prefer a CIF quote for simplicity. Whichever you choose, state it in the RFQ.

Are foundations and installation included in the price?

They are usually outside the factory's scope, and that is not a way of hiding cost — foundations depend on your ground and local engineering, and connections are made by your trades to the points marked on the factory drawings. We provide the drawings so your contractors can price those lines accurately.

What makes two quotes differ the most once scope is aligned?

Material specification, especially frame steel and the floor substrate. A lighter frame and a timber-based floor materially reduce cost and are hard to see in a render. Ask for unit weight and the substrate in writing — those two answers usually explain most of the gap.

Related guides

Explore these models

Not sure which format fits your project?

Send your target units, destination port and intended use — we reply with layout options, freight format and an indicative quote.

Start an inquiry