Quick-Open Folding Unit
Opens and closes in minutes — watch the full open-and-close cycle.
In short
The HuoSheng quick-open folding unit opens on site in minutes from a slim transport package and closes again for relocation or storage. It has a galvanized folding steel frame and factory-sealed fold positions, so the cycle can be repeated without extra waterproofing. Sizes and layouts are confirmed per order.
- Frame
- Galvanized folding steel frame
- Waterproofing
- Butyl tape + sealed fold positions
- Sizes and layouts
- Confirmed per order
- Manufacturer
- Hebei HuoSheng Integrated Housing Co., Ltd., Hebei, China
- Price basis
- Itemised quotation, EXW, FOB (Chinese port) or CIF (your port)
- Payment
- 30% T/T deposit, 70% T/T balance before shipping
- Sample
- Single sample unit available
- Inspection
- Every unit checked before packing; buyer or inspector welcome
- Lead time
- Confirmed with each quotation

Overview
The quick-open folding unit demonstrates what our folding structure does best: a slim transport package that opens on site in minutes, then closes again for relocation or storage. Roof-fold positions are factory sealed, so the cycle can be repeated without secondary waterproofing. Ideal for holiday parks, backyards and programs that need accommodation up and running fast.
Key points
- Fast open-and-close cycle — sealed at the factory
- Repeatable folding without secondary waterproofing
- Compact transport format for low freight cost
- Great for holiday parks, backyards and rapid deployment programs
Videos
Dimensions, layouts and optional fittings for this unit are confirmed per order. Ask us for the current quick-open folding unit models.
Frequently asked questions
How long does the quick-open folding unit take to open?
It opens in minutes on a prepared site. Watch the open-and-close video on this page.
Does it need waterproofing after each relocation?
No. The fold positions are sealed at the factory, so it can be opened and closed repeatedly without secondary waterproofing.
How is the price quoted?
Every quotation is itemised and priced EXW (factory), FOB (Chinese port) or CIF (your port). Send the country, size and quantity and we reply with a quotation, layout drawing and loading plan.
What are the payment terms?
30% T/T deposit to start production and 70% T/T balance before shipping.
Can I order one sample unit first?
Yes. Many buyers start with one unit to check build quality and installation before ordering in volume.
Can I see the factory or inspect my units?
Yes. We give live video tours of the production line on WhatsApp (+86 157 9281 7010), visitors are welcome at the factory in Hebei, and you or your inspector can attend the pre-shipment inspection.
Will it be approved in New Zealand or Australia?
That depends on your site, your local rules and your council. We supply drawings and a specification sheet for your designer or engineer. See our New Zealand buyers page and Australian council approval guide before you order.