The New Sliding Folding Room
Slide open the full-glass front for offices and employee rest areas.
In short
The HuoSheng sliding folding room is a compact black-frame unit with a full-height sliding tempered-glass front, built for site offices and employee rest areas. Every unit includes a rest area and restrooms. The frame is black aluminum profile on a steel base. Sizes and layouts are confirmed per order.
- Frame
- Black aluminum profile + steel base
- Front
- Full-height sliding tempered glass
- Included
- Rest area + restrooms
- Manufacturer
- Hebei HuoSheng Integrated Housing Co., Ltd., Hebei, China
- Price basis
- Itemised quotation, EXW, FOB (Chinese port) or CIF (your port)
- Payment
- 30% T/T deposit, 70% T/T balance before shipping
- Sample
- Single sample unit available
- Inspection
- Every unit checked before packing; buyer or inspector welcome
- Lead time
- Confirmed with each quotation

Overview
The new sliding folding room is our latest format: a compact black-frame unit with a full-height glass front that slides open to double your usable space. Designed for offices and employee rest areas, every unit includes a dedicated rest area and restrooms, factory-finished with the same standards as our expandable line — galvanized frame, insulated wall panels and a walk-in bathroom. Slide it closed for secure transport or storage, slide it open and it is ready to work.
Key points
- Full-height sliding glass front opens the entire space to the outdoors
- Includes a dedicated rest area and restrooms as standard
- Black aluminum frame with dark metal-carved exterior cladding
- Ideal for site offices, employee rest areas and compact commercial spaces
- Same factory standards: galvanized frame, insulated panels, walk-in bathroom
Photos from real projects

The new sliding folding room is available now — sizes, layouts and optional fittings are confirmed per order. Ask us for the current sliding folding room catalogue.
Frequently asked questions
What is the sliding folding room used for?
Site offices, employee rest areas and compact commercial spaces.
What is included as standard?
A dedicated rest area and restrooms, with a full-height sliding tempered-glass front.
How is the price quoted?
Every quotation is itemised and priced EXW (factory), FOB (Chinese port) or CIF (your port). Send the country, size and quantity and we reply with a quotation, layout drawing and loading plan.
What are the payment terms?
30% T/T deposit to start production and 70% T/T balance before shipping.
Can I order one sample unit first?
Yes. Many buyers start with one unit to check build quality and installation before ordering in volume.
Can I see the factory or inspect my units?
Yes. We give live video tours of the production line on WhatsApp (+86 157 9281 7010), visitors are welcome at the factory in Hebei, and you or your inspector can attend the pre-shipment inspection.
Will it be approved in New Zealand or Australia?
That depends on your site, your local rules and your council. We supply drawings and a specification sheet for your designer or engineer. See our New Zealand buyers page and Australian council approval guide before you order.