Container Customisation: What You Can and Cannot Change on an Expandable Container Home
Container customisation (customization in US spelling) on an expandable home covers layout, roof, windows, plumbing standard, veranda and finishes. The honest answer to the question every importer asks: the engineering core is fixed so the home ships and opens as designed, and almost everything a resident lives with — layout, roof type, windows, plumbing standard, veranda, finishes — is confirmed per order.
Ask a supplier "can you customize it?" and you will usually get a yes. The useful answer is more specific: which parts can change, which parts should not, and at what point in the process each decision has to be locked. That is what this guide sets out for our double-wing expandable homes, because the boundary between the two is what separates a customized home that arrives and opens correctly from a modified one that creates problems in production, in transit or on site.
The short version: the engineering core — the folding frame, the container corners, the floor structure and the fold sealing — is fixed, because it is what allows a complete home to travel as a container-format load and open on site without secondary waterproofing. Around that core, nearly everything a resident sees and uses is configurable: size, roof type, layout, windows and doors, plumbing standard, veranda, exterior finish, flooring and the roof waterproofing upgrade. Every one of those is confirmed per order, in writing, before production starts.
The engineered core: what stays fixed and why
Four systems make up the fixed core. The first is the welded galvanized steel frame with its eight shipping container corners — this is what lets a complete home be lifted, lashed and handled exactly like a standard container, and it is dimension-checked by inspectors because a folded unit only opens level if the frame was built square. The second is the floor structure: 18 mm cement board, asbestos-free, finished with PVC or SPC flooring. The third is the wall system: 0.4 mm double-sided purification panels inside and 25 mm metal carved cladding outside, assembled with steel tubes at the joints for stiffness.
The fourth is the folding and sealing system itself. The two wings fold down onto the main module for transport, and the roof-fold positions are sealed with butyl tape at the factory so the home can be opened on site without starting a waterproofing project. The painted frame carries an epoxy primer under two coats of two-component polyurethane topcoat, because the first months of the home's life are spent in salt air at sea.
These systems are fixed not as a policy but as an engineering position: they are what the QC inspection signs off, what the sea-freight packing plan is calculated around, and what hundreds of deliveries to Australian customers over the past two years have been built on. A request to change them is not a customization — it is a different product with unknown behaviour in transit.
The choices you configure
Everything below is a genuine choice, made per order. The table sets out what each option covers and how it is confirmed.
| What you choose | The options | How it is confirmed |
|---|---|---|
| Size | 20ft, 30ft or 40ft formats on one construction standard | Locked with the order; reference floor plans available for each length |
| Roof type | Gable (2.3 m internal height, pitched profile that sheds rain and snow) or flat roof (2.4 m clearance, developed for Australia) | Chosen per unit; both fold to the same transport format |
| Internal layout | Starts from the reference floor plan for your size, adjusted to your market | Drawn and confirmed before production |
| Windows and doors | AU-standard window and door options available | Specified at order confirmation |
| Plumbing | Australia-certified plumbing options | Declared at enquiry so the factory builds to the right standard |
| Veranda | Optional veranda configurations on the double-wing line | Confirmed together with the layout |
| Exterior finish | 25 mm metal carved panel finishes, including wood-grain looks | Current finish options confirmed per order |
| Interior flooring | PVC or SPC over the cement board floor | Selected at order confirmation |
| Roof waterproofing | Butyl tape as standard; membrane or FRP upgrade | Chosen per order before production |
One row deserves a note of its own. Plumbing and window standards only work if you declare your destination market at the enquiry stage. The factory can build to Australian-standard options across the range, but a unit already produced to a different specification cannot be redirected to another market afterwards — so the market is the first customization decision, not the last.
How a customization request actually runs
The process is deliberately front-loaded, because a change confirmed before production costs a drawing revision, while the same change after the line starts costs real money and time. It runs in five steps.
- You send the intended use, the number of units and the destination port.
- We return the reference floor plan for the size under consideration, together with the specification sheet.
- You mark what your market needs changed — room proportions, window positions, veranda, waterproofing upgrade.
- The layout is drawn and confirmed in writing before production, and the packing plan is documented with it.
- Production runs under the normal QC sequence and the unit ships to the confirmed packing plan.
With production capacity of 800 to 1,000 sets per year across the three formats, that confirmation step is also what keeps the schedule honest: an order enters the line with its layout already frozen, so a customized unit and a standard one take the same path through the workshop.
Four ways customization requests go wrong
These patterns account for most of the friction buyers experience with any factory, and all four are avoidable at the planning stage.
The first is asking to customize the core — usually to reduce weight or freight cost. The 20ft double-wing unit weighs about 3.8 tonnes against roughly 2.6 tonnes common in the industry, and that difference is the steel in the frame and floor. It is what lets the unit open square, ride out the voyage and land level. Thinning it out to save freight is a false economy we do not offer.
The second is sending changes after production starts. Once the layout is confirmed and the order enters the line, treat the drawing as frozen. Late changes do not just cost a revision — they can put a finished unit out of sequence with its packing plan.
The third is ordering "standard" first and asking for market compliance later. If your market needs specific window, door or plumbing specifications, they belong in the first message, because those options are built in during production, not retrofitted.
The fourth is treating the veranda as an afterthought. A veranda changes the opened footprint, the pad you prepare and sometimes the access route for placing the unit, so it belongs in the site planning conversation rather than the fit-out conversation. Our size-selection guide covers how footprint decisions affect the site; work through it before finalizing a veranda configuration.
None of this requires a factory visit to start. Download the 20ft reference floor plan, the water supply and drainage diagram and the flat roof electrical plan from our Download centre, mark up what your market needs, and send the list with your destination port. We reply with the confirmed layout options, the freight format and an indicative quotation — and everything you asked to change will be in writing before the first weld.
Frequently asked questions
Can I get a completely custom floor plan?
Layouts start from the reference floor plans for each size and are customized per order — room proportions, window and door positions and the veranda are all adjustable at the drawing stage. The frame and folding core stay as engineered; everything inside and attached to the envelope is drawn to your market and confirmed before production.
Can you build to my country's standards?
Australia-certified plumbing and AU-standard window and door options are available across the double-wing range, developed through hundreds of deliveries to Australian customers over the past two years. For other markets, send the applicable requirements with your enquiry — confirmation is per order, and a unit built for one market should not be assumed to comply with another's.
Does customization affect shipping?
No. Every roof type and layout folds down to the same container-format transport logic, and the packing plan — load, sequence and unloading — is documented per order before the unit leaves the factory. A customized unit handles exactly like a standard one in the logistics chain.
How much does a customized unit cost compared with a standard one?
It depends on which options you select — a veranda, a waterproofing upgrade and a non-standard layout each affect the quotation differently. Send your requirement list and destination port and we reply with an indicative quotation per configuration; configurations are confirmed per order, so there is no single surcharge figure.
Explore these models
- Double-Wing Expandable Container House — Wings fold down for shipping, open up to a full-width home with veranda options.
- Folding House — Quick-open folding structure for holiday parks, backyards and rapid deployment.
Not sure which format fits your project?
Send your target units, destination port and intended use — we reply with layout options, freight format and an indicative quote.
Start an inquiry