2026-10-22 · 10 min read

Interior Layouts Explained: How to Read a Double-Wing Expandable Container Home Floor Plan

A floor plan for an expandable container home is not a styling exercise. It is a budget of eleven partition panels, three interior doors, six sliding windows and one immovable bathroom module — and every layout you want has to be paid for out of that budget before the frame is welded.

Most buyers arrive with a picture of a room. What they need is a budget. On a double-wing expandable container house the layout is not arranged around your furniture at all: it is arranged around a fixed count of wall panels, a fixed count of windows and doors, and one bathroom module that lands in the same place every time because it is plumbed into the structure. The 20ft reference layout is a good example, and reading it is straightforward once you treat the panel counts as currency rather than as background detail.

This is the layout companion to our guide to reading an expandable container home specification sheet, which covers what the unit is made of. This one asks a narrower question: given what it is made of, what shape can your days take inside it.

Read the plate before the rooms

The deployed envelope is the first fixed quantity. The 20ft double-wing unit folds to 5900 by 2250 by 2530 mm and expands to 5900 by 6360 by 2530 mm, so the deployed footprint is 5.900 m by 6.360 m — a little over 37 square metres of continuous floor. The height of 2530 mm is the exterior envelope height, and the internal height you actually stand inside comes from the roof type: 2.3 m for the gable, 2.4 m for the flat roof.

Everything else on the plan has to fit inside that plate. Four documents in the Download centre let you do this reading yourself rather than from a photograph: the dimensioned 20ft floor plan with electrical and plumbing layout, the two-page export specification, the water supply and drainage diagram for the bathroom module, and the flat roof electrical plan showing circuit routing and control box placement. Read the floor plan and the specification side by side: the plan shows positions, the specification shows the counts, and the counts are what constrain the positions.

Layout resourceWhat it fixesWhat it tells you
20ft floor plan (English)Positions of walls, doors, windows and fittingsWhere the bathroom module sits and how the entry door relates to the folding line
20ft double-wing export specificationFolded and expanded dimensions, counts and sizes of every panel, window, door and fixtureThe envelope and the panel budget the layout is drawn from
20ft water supply and drainage diagramHot and cold supply plus the drainage runWhy the bathroom cannot be relocated without re-plumbing the wall
20ft flat roof electrical planCircuit routing, socket positions, lighting, control boxWhich sockets land in which zone, and the 6.0 kW ceiling

The partition budget — eleven panels is your entire room allowance

This is the number that surprises people. The 20ft unit ships with eighteen 75 mm exterior sandwich panels and eleven 50 mm interior partition panels. Those eleven panels are the whole of your internal room-making budget. If you ask for a separate bedroom, a separate office and a storage cupboard, you are asking for more partitions than the standard layout allocates.

The specification also tells you how many openings the partitions contain, which tells you what the standard layout already does. There are two interior steel-wood doors at 830 by 2000 mm and one aluminium-alloy bathroom door at 750 by 2000 mm. Three door leaves across eleven partition panels means the standard layout resolves into three enclosed or semi-enclosed conditions: the bathroom module, a sleeping zone behind an interior door, and the remaining open living and kitchen plate. That is not a design opinion we are inferring from a brochure; it is arithmetic on the door schedule.

So the layout question is not how many rooms you want. It is which two of your three candidates get a door, and which one is absorbed as an open zone. Our guide to customising an expandable container home covers what can be changed at order stage.

The wet core — the bathroom module is the one immovable object

The bathroom is specified as a complete module rather than as a set of fixtures to be positioned: a ceramic toilet, an 800 by 1360 mm shower enclosure, a 420 by 540 mm washbasin and a mirror cabinet, behind its own 750 by 2000 mm aluminium door. It is generous for a compact unit and it is not adjustable in any way that matters, because the water supply and drainage diagram routes the supply lines and the waste run to that specific corner of the plate.

That single fact organises the entire layout. Every sensible arrangement puts the bathroom against the wall the drainage run reaches, keeps the kitchen sink on an adjacent wall, and treats the panel opposite as the one worth spending on a door. Layouts that accept the wet core get finished on day one.

A second constraint sits alongside it: the floor. The subfloor is 18 mm cement board with 2.0 mm PVC vinyl over it, and PVC is the specified finish throughout. A wet area that has to be tiled differently on site is a change to a surface already installed at the factory, which is why the wet zone and its drainage path are worth settling in the drawing.

The kitchen wall — two cabinets and a sink decide the working triangle

The standard kitchen is a 440 by 660 mm sink and two cabinets, at 580 by 1600 mm and 580 by 1700 mm. Read those three numbers as a work-surface budget rather than as a kitchen: the two cabinets give roughly 3.3 linear metres of run, the sink sits within it, and the surrounding wall determines whether that run reads as a galley, an L or a peninsula once the partition count is settled.

The consequence is that the kitchen is generous in width and shallow in depth. A 580 mm deep cabinet plus a sink is a single-cook line, not a place for an oven bank or a full appliance run as standard. If your layout needs those, the fit-out scope changes and the layout conversation should happen before the order rather than during installation — the cabinet positions are set when the interior panels are placed.

The dining question, though, is usually decided by the folding line rather than by the kitchen. An expandable house opens into a full-width layout with an optional veranda, so the plate in front of the sliding exterior door is often where the table ends up. Our guide to veranda options covers that decision in more detail if the indoor floor area is tight.

Daylight budget — six windows, one top-hung vent, one 2230 mm slider

Openings are counted too. The standard fit gives six 930 by 930 mm thermal-break aluminium sliding windows, one 500 by 500 mm thermal-break top-hung window, and a Series 70 thermal-break aluminium sliding exterior door at 2230 by 1920 mm. Those six windows are the daylight budget for the whole plate, and where they sit relative to the folding line is the difference between a room that cross-ventilates and a room that does not.

The folding line matters because the wings carry panels that were exterior walls when the unit was folded. Opening the wings turns some of that exterior envelope into interior surface, which is why the internal partition count is a design decision rather than a leftover. In practice the useful move is to put the windows so that the open plan zone gets two of them on opposite sides of the deployed footprint — cross-ventilation in a hot climate is a layout decision before it is an appliance decision.

Our guide to insulation for expandable container homes in cold climates covers the specification side of this, and our guide to connecting services to an expandable container home covers what happens at the wall penetration once the layout is fixed.

Where the layout meets the code

One layout consequence is regulatory, and it is worth stating precisely because it changes which zone you can put where. Clause 10.3.1 of the Housing Provisions in the National Construction Code 2022 sets minimum room heights: at least 2.4 m in a habitable room other than a kitchen, at least 2.1 m in a kitchen, corridor, bathroom, shower room, laundry and pantry, and at least 2.4 m achieved over two-thirds of the floor area where a ceiling slopes.

Our gable roof type gives 2.3 m internal height and the flat roof type gives 2.4 m. A gable unit at 2.3 m sits below the Deemed-to-Satisfy figure for a habitable room, which is not a prohibition but is exactly the detail that turns into a certifier conversation, and the flat roof type was developed for Australia precisely because of that clearance requirement. The Australian Building Codes Board states in its prefabricated, modular and offsite construction handbook, published November 2024, that buildings using modern methods of construction are regulated in the same manner as other construction products, so the route to approval exists. A layout that puts a sleeping zone under the lower part of a ceiling is the one that gets questioned, so the roof type and the zone assignment belong in the same conversation.

The practical ordering is simple: settle the roof type, then assign the zones, then draw the partitions. Our guide to council approval for container homes in Australia covers the approval chain.

Three layout variants and what each one spends

The three arrangements below are the ones we see most often for the 20ft plate. Each spends the same eleven partition panels and the same opening schedule differently, which is why the choice is a layout decision rather than a preference. The 30ft and 40ft layouts are confirmed per order.

Layout variantHow the budget is spentWhat it suitsWhat it costs you
Studio with separated bathroomBathroom module enclosed on three sides, one interior door to a sleeping alcove, kitchen and living left openOne or two occupants who treat the plate as a single room and value daylight over separationNo genuine second room; work and sleep share the same volume
Split-zone with a closed work roomBathroom module plus one fully enclosed interior room behind a second steel-wood door, open kitchen and living zoneRemote workers, home-office buyers, or anyone needing a door that closesThe open zone loses one wall of light, and the 6.0 kW board becomes the binding constraint
Bedroom-plus-living with kitchen to one wallBathroom module and a sleeping zone separated, kitchen run consolidated on one wall, dining moved to the veranda lineBuyers who intend to live in the unit year-round and want the indoor plate kept flexibleIndoor dining depends on the veranda option and therefore on the site and the season

What to send us to get the plan back

Layout drawings are part of the order conversation, not a free consultation afterwards. Five lines are enough for us to return the reference floor plan for your size, the specification sheet, the packing and delivery format and an indicative quotation.

  • The format, and the roof type if internal height matters for your approval pathway or your market.
  • How many enclosed rooms you need behind a door, so we can confirm whether the partition count covers it.
  • Where the bathroom module sits relative to your site, so the water and drainage routing can be checked against the plan.
  • The concurrent electrical load you expect, against the 6.0 kW distribution board and its 16 A air-conditioner circuit.
  • The destination country and site, so the plumbing and the window and door options can be declared at enquiry rather than inherited.

Send those five lines and we reply against a real specification rather than a mood board. The panel counts, the door schedule, the window sizes, the fixture dimensions and the 6.0 kW board are all documented, which is why a layout conversation can be settled in one exchange instead of three site visits.

The production side is equally documented. Annual capacity runs at 800 to 1000 sets, hundreds of these homes have been delivered to Australian customers over the past two years, and every unit leaves on a specification with the drawing, the packing record and the QC inspection behind it. Download the 20ft documents from the Download centre, count your panels, and the layout usually decides itself.

Frequently asked questions

How many interior walls can an expandable container home have?

On the 20ft double-wing reference layout the budget is eleven 50 mm interior partition panels, alongside eighteen 75 mm exterior sandwich panels. That panel count is what produces the standard arrangement, which uses two 830 by 2000 mm steel-wood interior doors and one 750 by 2000 mm aluminium bathroom door — three enclosed conditions from eleven panels. If your layout needs more enclosed rooms than that, the change is made at order stage against the specification rather than added on site, because the partitions are installed at the factory. The 30ft and 40ft reference layouts are confirmed per order and are discussed in our guide to choosing between 20ft, 30ft and 40ft.

Can the bathroom be moved to a different corner of the layout?

Not as a free decision. The bathroom ships as a complete module with a ceramic toilet, an 800 by 1360 mm shower enclosure, a 420 by 540 mm washbasin and a mirror cabinet, and the water supply and drainage diagram routes the supply lines and the waste run to the corner where it sits. Moving it means re-plumbing the wall, so any repositioning has to be resolved in the drawing before production. Our water supply and drainage diagram for the 20ft is in the Download centre if you want to see the routing before you ask.

What is the actual floor area of a 20ft double-wing unit when it is expanded?

The unit folds to 5900 by 2250 by 2530 mm and expands to 5900 by 6360 by 2530 mm, which gives a deployed floor plate of 5.900 m by 6.360 m — a little over 37 square metres of continuous floor. The 2530 mm figure is the exterior envelope height, not the internal height: internal height comes from the roof type, at 2.3 m for the gable and 2.4 m for the flat roof. Weights and internal clearances are worth checking against the two-page export specification, which is also in the Download centre.

How much electrical capacity does the layout have to work with?

The standard fit is a distribution board rated Pe 6.0 kW at 220 V and 50 Hz, six 40 W LED ceiling lights, seven 10 A five-hole sockets in CN, AU or EU standard, one dedicated 16 A three-pin air-conditioner socket and four light switches. Maximum indoor load is 6,000 W, with 6 mm squared copper on the incoming supply, 4.0 mm squared on the air-conditioner circuit and 1.5 mm squared on lighting. Because the socket positions are fixed by the electrical plan at production, the concurrent load is a layout question — a closed work room with monitors competing with air-conditioning and appliances is a question about sockets and circuits, not about furniture.

Do I need a floor plan before I order, or is the standard layout fine?

The standard layout is a coherent answer for one or two occupants and it is what the reference drawings show, so it is fine to proceed on it. A floor plan becomes necessary as soon as your layout needs something the eleven partition panels do not cover: a second enclosed room, a work room with a door that closes, or a bathroom position that does not match the wet wall. Reference floor plans for 20ft, 30ft and 40ft are provided, layouts are customised to each market and confirmed before production, so send the room list with your enquiry and the drawing comes back matched to it.

Explore these models

Not sure which format fits your project?

Send your target units, destination port and intended use — we reply with layout options, freight format and an indicative quote.

Start an inquiry