Preparing Your Site for an Expandable Container Home

Your expandable home arrives factory-finished — but the site decides how fast it becomes livable. Here is the five-stage preparation checklist we walk through with Australian customers before every delivery.

One of the biggest advantages of a double-wing expandable container home is that most of the work happens in the factory. Frames are welded, floors are laid, wall panels are fitted, and the plumbing and electrical systems are installed and tested before the unit ever leaves our workshop. By the time it reaches you, the home is essentially complete — it just needs a prepared site, a level foundation and connection to services.

That is why site preparation is the single biggest factor in how fast your home becomes livable. Over the past two years we have delivered hundreds of expandable homes to Australian customers, and the projects that went smoothly all had one thing in common: the site was prepared before the truck arrived. This guide walks through the five stages we recommend to every buyer, in the order we recommend doing them.

Stage 1: Confirm the footprint and position

Start by locking down where the home will sit. Our reference floor plans for the 20ft, 30ft and 40ft formats — free to download from our Download centre — show the exact external dimensions and the layout inside, so you can mark the footprint on site with pegs and string. Keep three things in mind when choosing the position: the side the veranda will face (it becomes your outdoor living zone), the direction of prevailing weather on exposed sites, and enough clear level ground around the unit for the unfolding process itself.

Remember that a double-wing home is compact in transport and full-width once opened. The position you peg out should be the expanded footprint, not the folded one. Orientation also affects comfort: in most of Australia, living areas facing north capture winter sun, while the veranda side can be tuned to the view or the afternoon shade.

Stage 2: Prepare a level foundation

A double-wing home is a precision-built structure. Frames are welded from galvanized square tubes, the base carries thirteen steel purlins per side at roughly 340 mm spacing, and the finished 20ft unit weighs around 3.8 tonnes — substantially more than many comparable products because of the steel inside it. That weight sits on eight shipping container corners, which is exactly why the foundation underneath must be level and load-ready.

In our installations, pier or block supports on a prepared pad are the most common solution, and a level concrete pad works equally well where the site allows. What matters is that the support points line up with the container corners and that the unit sits level in both directions — the folding mechanism relies on it. We provide foundation guidance per project, and your working drawings will mark the support positions. If your site is sloped, pier systems handle the fall; if it is soft, bring in a local engineer before ordering rather than after.

Foundation optionTypical useNotes
Leveled concrete padFlat sites, permanent placementsSimplest to verify level; suits most residential installs
Pier or block supportsSloped or uneven sitesCommon in our Australian installations; adjust to level per drawings
Engineered footing systemSoft soil, high-wind or specific council requirementsDesign confirmed with local engineer; drawings available from us

Stage 3: Plan the delivery access

Before ordering, walk the route from the road to your prepared pad. The folded unit travels as one compact load with the wings down, and it is hoisted or slid into position using the eight galvanized container corners built into the frame. Check that a truck and, if a crane is needed on your site, a crane can physically reach the pad — gates, overhanging branches and soft ground after rain are the three things that delay deliveries most often.

This is also the moment to confirm the delivery format with us. Because the home ships folded, one load covers what would otherwise take several trucks of materials, and every unit is packed for sea freight to survive the journey. Access requirements for your specific site are confirmed per order as part of the packing plan.

Stage 4: Plan utilities connection points

Inside the factory, the electrical system is fully wired through conduit and the plumbing is pre-installed — every unit passes water pressure tests and a power-on electrical check before packing. On site, your trades are connecting to pre-tested systems, not roughing in from scratch — which is where the time savings come from.

For Australian buyers, two specification choices matter here. First, plumbing products can be supplied as AU-certified units, which keeps the on-site connection straightforward for your licensed plumber. Second, windows and doors can be supplied to AU standards. Mark where you want the switchboard, the water inlet and the sewage connection relative to the unit, and send us the positions — layouts are customized per order, so utility points can be positioned to suit your site before production starts.

Stage 5: Drainage, veranda and finishing

The roof is a butyl-taped system with sealed fold positions, engineered so the home can be folded and unfolded repeatedly without secondary waterproofing — but the site still needs somewhere for rainwater to go. Plan gutters and drainage away from the foundation supports, especially on clay soils. If your order includes a veranda, its position is fixed by the layout, so factor the deck and any steps into your ground preparation.

Finally, schedule the finishing trades — connection of services, skirting touch-ups and any landscaping — for the days after delivery, not before. Because floors are an 18 mm asbestos-free cement board topped with PVC or SPC, and walls are factory-finished panels, there is no painting or lining work to do inside. The home arrives done.

The full checklist, stage by stage

Here is the complete preparation sequence in one table. Work through it in order and keep each stage documented — your future self, your installer and your insurer will all thank you.

StageWhat to prepareWhy it matters
FootprintMark the expanded layout with pegs; confirm veranda side and orientationEverything downstream depends on the final position
FoundationLevel pad or pier supports aligned to container corners, verified levelThe folding mechanism and door operation rely on a level base
AccessClear truck route, crane position if needed, firm ground on delivery dayFolded delivery is one load — access is the last hurdle
UtilitiesMarked switchboard, water inlet and sewage positions sent to usLayouts are customized per order — utility points can suit your site
DrainageGutters and runoff directed away from foundation supportsProtects the foundation and the butyl-taped roof system
FinishingConnection trades scheduled for after deliveryInterior arrives finished — only connections happen on site

Where to go deeper on each stage

Since this guide was first published, each stage has grown its own deep dive on this site. The foundation stage now has a full foundation guide — blocks, piles and slabs, and how the opened footprint (veranda included) sizes the pad. The utilities stage has a services guide covering what arrives factory-installed and tested, and the three drawings your trades can mark up before delivery. The drainage conversation continues in the maintenance guide, whose annual walk-around starts at the pad and at the water flowing away from it.

Two more guides belong in the planning folder for certain sites. The veranda guide covers what the stage-one veranda flag changes about footprint, access and layout confirmation. And for sites in cooler regions, the cold-climate specification guide matters here more than anywhere: insulation and roof type are per-order decisions, and they are cheapest to make at enquiry rather than after the order.

What we do before the home leaves the factory

Preparation is a two-sided job. On our side, every frame is dimension-checked after welding and polishing, wall panels are assembled with steel tubes at the joints, and the painted frame carries an epoxy primer with two coats of two-component topcoat. Plumbing is pressure-tested, electrical is inspected with the power-on test recorded on video, and a professional QC team signs off the exterior and interior before the unit is packed for sea freight.

The result of that discipline is an install that looks like the videos: unfold, level, connect, live. If you are planning a project in Australia or New Zealand, download the reference floor plans and water diagram from our Download centre, send us your site layout, and our engineering team will confirm the connection positions and foundation guidance for your project before production begins.

Frequently asked questions

Do I need council approval for an expandable container home?

Requirements vary by state, council and how the home will be used. We provide working drawings, floor plans and technical documentation to support your application, but approvals are confirmed with your local authorities.

What foundation does a double-wing home need?

A level prepared foundation — pier or block supports on a prepared pad are the most common in our installations, and a concrete pad works equally well. Support positions are marked on the working drawings we supply per project.

Who connects the plumbing and electrical on site?

Your licensed local trades connect the home to site services. For Australian buyers, units can be specified with AU-certified plumbing products and AU-standard windows and doors, and every system is pressure- and power-tested at the factory before dispatch.

How is the home delivered to my site?

The wings fold down so the home travels as one compact container load. On site it is hoisted or slid into position using the built-in container corners. Access requirements are confirmed per order as part of the packing plan.