2026-09-29 · 8 min read
How to Read an Expandable Container Home Spec Sheet: The Lines That Actually Matter
Three supplier spec sheets look identical until you know which lines decide performance. This walkthrough uses our own 20ft sheet as the worked example: what each line means, what to compare across suppliers, and the omissions worth a question before you commit.
Collect quotations from three factories for expandable container homes and you will usually receive three specification sheets that look almost interchangeable: similar line names, similar drawings, similar-sounding numbers. They are not interchangeable. The lines that decide how a home performs on site — and how it behaves at sea — are a short list, and the real differences between suppliers hide inside how concretely each line is written.
This walkthrough uses our own 20ft double-wing specification sheet as the worked example, line by line: what each line means, what to compare when you put sheets side by side, and which omissions are worth a question before you commit. It is the reading companion to our customization guide — once you know which lines matter, you also know which of them you can change per order.
The six lines that decide performance
Most of a spec sheet is context. These six lines are the substance, because together they describe the structure, the envelope and the handling of the finished home.
| Spec line | What our 20ft sheet says | What to compare it against |
|---|---|---|
| Frame | Welded galvanized square tube with 8 shipping container corners | Galvanizing (not paint alone) and corner castings visible in factory photos, not only in drawings |
| Floor purlins | 13 bottom purlins per side at roughly 340 mm spacing (20ft) | Ask every supplier to state a purlin count and spacing — it is what the floor actually rides on |
| Floor | 18 mm cement board, asbestos-free, with PVC or SPC finish | The board material, not the flooring brand; timber-based boards behave differently in humid transit |
| Wall build-up | 0.4 mm double-sided purification panel inside; 25 mm metal-carved cladding outside | Two separate numbers — interior panel face and exterior cladding thickness are different lines, not one |
| Internal height | 2.3 m (gable roof) / 2.4 m (flat roof) | Whether the quoted height is internal clear height or a transport/ridge figure |
| Weight (20ft) | ≈ 3.8 t folded | Against the roughly 2.6 t common in the industry — then ask where the extra steel sits |
Frame and purlins: the lines you can verify with a photo
The frame line matters because the frame does three jobs at once: it carries the home, it protects the fold geometry, and it provides the lifting points. Ours is welded from galvanized square tube — galvanizing rather than paint alone is the detail to confirm, because the first weeks of the home's life are spent in salt air — and it carries eight container corners, which is what allows a complete home to be lifted and lashed exactly like a shipping container.
The purlin line is the one buyers most often skip, because few sheets state it. Purlins are the framing members the floor board fixes to, spaced between the frame members; their count and spacing decide how solid the floor feels underfoot and how it stays that way over years of service. Our 20ft base carries thirteen bottom purlins per side at roughly 340 mm spacing — dense enough that the floor does not shake underfoot — and we state the numbers because they are checkable: ask any supplier for theirs, and ask for a factory photo of the base structure rather than a rendered drawing. A supplier who answers both questions quickly has nothing to hide on the line.
The floor line most sheets shorten to “flooring”
“Flooring: PVC” tells you almost nothing, because PVC or SPC is only the finish. The structural line is the board underneath it — ours is 18 mm cement board, asbestos-free. Board material matters more in an expandable home than in a conventional build, because the floor is part of a unit that folds for transport and is expected to arrive square: a cement board holds its dimensions and rigidity in a way moisture-sensitive boards do not, and it arrives without the formaldehyde question attached to some timber products.
When you compare sheets, read the floor line as two items: the board (material and thickness) and the finish (PVC or SPC). If a sheet gives only the finish, ask for the board. It is a fair question and a revealing one.
Internal height: read it as clear height, by roof type
Height is the line most often quoted ambiguously. Some sheets print transport height (the folded package), others quote a ridge figure. The number that matters inside the home is internal clear height, and it follows the roof type: the gable type gives 2.3 m with a pitched profile that sheds rain and snow, while the flat roof type — developed for Australia — gives 2.4 m on the same footprint. Both figures are measured inside the opened home, and both belong on the sheet next to the roof type they describe. If a quotation lists one height without a roof type, that is the question to send back.
Weight: a materials line hiding in the logistics section
Weight is usually presented as a freight number, but read it as a materials line. A standard 20ft double-wing unit from our line weighs about 3.8 tonnes folded, against roughly 2.6 tonnes typical across the industry. The difference is the steel in the frame and floor, and it is what lets the unit open square, ride out the voyage and land level on simple ground support. When a competing sheet quotes a lighter figure, ask what the weight includes and where the steel sits — the answer tells you more about the build than any rendering.
Waterproofing and compliance: two lines to read literally
The waterproofing line should state what happens at the fold positions, because that is where an expandable home differs from every conventional build. Ours arrive with roof-fold positions factory-sealed with butyl tape, so the home can be opened on site without starting a waterproofing project; a membrane or FRP upgrade is available per order for buyers who want the heavier system. If a sheet says only “waterproofed”, ask what happens at the folds — the phrase describes the roof plane, not the joint.
Compliance lines work the same way: read them as options to select, not assumptions to inherit. AU-standard window and door options and Australia-certified plumbing are available across the range, and they are built in during production once your destination market is declared at enquiry. A unit produced before the market was declared is not a compliance starting point — it is a finished specification that may not fit yours.
Run the comparison like this
With the six lines in hand, a three-sheet comparison stops being a reading exercise and becomes a checklist.
- Normalize the sheets first — same units, same names, one table with the six lines as rows and suppliers as columns.
- Fill every cell from the supplier's own document; do not carry a figure across from a conversation.
- Treat every blank or vague cell as a question, and note how concretely each supplier answers.
- Ask for factory photographs of frame, roof structure and folded corners — photos answer what drawings soften.
- Get every per-order item (roof type, layout, waterproofing upgrade, market standard) confirmed in writing before production starts.
The fastest way to start is from a complete sheet rather than a blank table. Our Download centre carries the worked example: the 20ft double-wing specification sheet, the dimensioned floor plan, the water supply and drainage diagram and the flat roof electrical plan. Download them, put your shortlisted suppliers' sheets beside them, and the differences will surface within one page. When they do, send us the lines you want changed — we reply with the confirmed options, the packing format and an indicative quotation.
Frequently asked questions
What exactly is a purification panel?
It is a sandwich wall panel with 0.4 mm steel faces on both sides and an insulating core, used across our interiors. The double steel face is what the “double-sided” line refers to — it describes the panel construction, not a coating. It is the standard interior wall surface across our expandable and flat pack lines.
Why does purlin count matter so much?
Floor purlins carry the cement board between the frame members, so their count and spacing decide how solid the floor feels underfoot and how it holds up over years of service. It is also an easy honesty check: a factory that states “thirteen bottom purlins per side, roughly 340 mm spacing” on a 20ft base has committed to a checkable number, which is more useful to a buyer than a general claim about “reinforced flooring”.
Is a heavier unit always the better build?
Heavier usually means more steel, and in our case the roughly 3.8 tonnes of a 20ft unit reflects the frame and floor steel that keep the unit square and stable. But the better question is where the weight sits — a heavy roof with a light frame is not the same as a heavy frame with a proper floor. Ask for the breakdown, not just the total.
Can we receive the full specification before requesting a quotation?
Yes. The 20ft double-wing specification sheet, floor plan, water diagram and flat roof electrical plan are all available in our Download centre without any registration. Sheets for 30ft and 40ft formats and per-order configurations are confirmed per order — send your size and market and we provide the matching documentation.
Explore these models
- Double-Wing Expandable Container House — Wings fold down for shipping, open up to a full-width home with veranda options.
- Flat Pack Container House — Panelized units that stack efficiently in a shipping container for low freight cost.
Not sure which format fits your project?
Send your target units, destination port and intended use — we reply with layout options, freight format and an indicative quote.
Start an inquiry